CONTAINER LASHING EQUIPMENT
LOAD BINDING/LOAD LASHING In the arrangement of loads of many packages, sometim…
LOAD BINDING/LOAD LASHING In the arrangement of loads of many packages, sometim…
Container Construction The construction that will be described here is a conta…
TYPE OF CONTAINER SHIP The progress of shipping science and technology, espec…
Supervising the Second Officer for receiving weather report and facsimile timel…
RESPONSIBILITY FOR VERIFYING CREW Heads of departments, i.e. Chief Officer, Chi…
RECORDING DRAFTS The draft must be taken and recorded in each case when the shi…
TEST OF NAVIGATIONAL AND COMMUNICATIONS EQUIPMENT All navigational and communic…
DEPARTURE BRIDGE CHECK LIST The following is a test carried out before the shi…
PASSAGE PLANNING The following procedure is to be carried out in preparation fo…
To describe the system which ensures that dry-docking work is carried out in an…
WINDLASS & WINCHES PRECAUTIONS Greasing of bearings, brake linkages sho…
CHANGE OUT AND RETIRING OF MOORING ROPES, WIRE ROPES AND MOORING TAILS FROM …
SHIP MOORING EQUIPMENT Before entering port, all preparations of the necess…
TREATMENT OF SLOPS AND OILY WATER Oil or oily mixtures, which cannot be dis…
PRODUCED WATER/ OILY WATER TREATMENT & DISPOSAL The OIM / MARINE Superin…
Ship Anchoring Always first check that the area below the anchor is clear o…
DUTIES OF THE CHIEF OFFICER The Chief Officer is also the Ship’s Safety Offi…
Master is responsible for the duties listed below. SHALL HAVE OVERRIDING AUTHO…
DISPOSAL OF WASTE OILS AND SLUDGE Waste oil and sludge generated in the Engin…
To ensure ship safety when she is navigating in ice area. The Master is respons…